Campus at dusk

Built for Scale. Designed for AI. Powered by Partnership.

JDC Nigeria Data Centres is developing a 55 MW, Tier III-targeted digital-infrastructure campus in Southern Nigeria. The platform is being developed to bring together specialist operating, technology, connectivity and commercial partners serving cloud, enterprise, carrier and high-density computing requirements.

55 MWFacility Load
DedicatedModular N+1 On-Site Generation
DesignedFor Continuous Mission-Critical Operation

One platform. Every critical layer.

JDC brings the energy, facility, connectivity, operations and commercial disciplines of a modern data centre into one coordinated development programme. Wellsmart Energy Limited is developing the dedicated energy and resilience platform. Specialist partners will be engaged to lead data-centre design, certification, connectivity, operations and customer development.

Power
Facility
Connectivity
Operations
Customer Experience
Partnerships

A platform designed for the right partners.

JDC is engaging specialist operating, technical, connectivity and commercial partners capable of contributing measurable long-term value to the platform. Any long-term participation will be structured around defined delivery, operating and commercial contributions.

01Operating and certification partners

Lead operator design standards, commissioning, Tier certification pathways, operating systems, staffing and long-term facility management.

02Technology and delivery partners

Bring data-centre engineering, cooling, electrical systems, controls, security, construction management and integrated commissioning capability.

03Connectivity and ecosystem partners

Provide diverse fibre routes, carrier-neutral interconnection, cloud and content access, internet exchange connectivity and customer reach.

04Commercial and customer partners

Support anchor capacity, customer origination, enterprise access, market development and long-term contracted business.

What we value:
Delivery capabilityOperating excellenceCustomer accessTechnologyLong-term commitment
Bring the capability that completes the platform
The Campus

55 MW of facility scale. Modular from the ground up.

JDC is being developed as one fully coordinated campus platform, planned around the full 55 MW facility requirement. Common energy, connectivity, security, roads, drainage and facility infrastructure will support the wider programme, while data halls and white space are activated in commercially sensible modules aligned with customer commitments.

Final saleable IT capacity will be established through operator-led design, reflecting cooling architecture, rack density, resilience and the requirements of cloud, enterprise and high-density workloads.

Explore the Campus
Campus Design
Modular data halls and private suites
High-density and AI/HPC-ready design pathways
Scalable electrical and cooling distribution
Integrated fire, security and monitoring systems
Customer activation aligned with contracted demand

Dedicated power. Designed for continuity.

The campus is being developed around a dedicated modular on-site generation and resilience platform led by Wellsmart Energy Limited. Final generation capacity, equipment configuration and mission-critical resilience architecture will be established through operator-led design, detailed engineering and site-rated OEM guarantees.

55 MW
Facility Load
Dedicated
Modular N+1 On-Site Generation
Designed
For Continuous Mission-Critical Operation

Powered by Wellsmart Energy Limited.

Carrier-neutral by design.

JDC is being designed for two physically diverse fibre entrances, carrier-neutral meet-me rooms, multiple-carrier access, cloud and content interconnection, and flexible cross-connect services. Final routes and service commitments will be contracted as part of the development programme.

Physically diverse fibre-route design
Carrier-neutral meet-me rooms
Cloud, content and internet-exchange access
Managed cross-connect and interconnection services
Regional access from Southern Nigeria
Connectivity Design

Capacity for the workloads shaping the next decade.

JDC will support customers from single enterprise deployments to dedicated halls and high-density environments. Commercial structures will be developed around long-term capacity and service agreements for qualifying customers.

Wholesale Colocation

Scalable capacity for cloud, content, carrier and large enterprise customers requiring contiguous space and dependable infrastructure.

Enterprise Private Suites

Secure, dedicated environments for regulated institutions, industrial companies, government and critical business systems.

Hyperscale and Cloud

Modular campus capacity designed to support cloud platforms, content providers and large-scale digital services.

AI and High-Performance Computing

Power and cooling pathways designed for high-density deployments, subject to final operator-led engineering.

Disaster Recovery and Business Continuity

Location-diverse infrastructure for organisations strengthening resilience beyond their primary operating environments.

Managed Connectivity and Cross-Connects

Carrier access, interconnection, cloud on-ramps, cross-connects and related operational support.

Digital growth needs infrastructure beyond one market.
Location Strategy

Digital growth needs infrastructure beyond one market.

Southern Nigeria brings together major population centres, financial institutions, industrial clusters, public-sector workloads and regional businesses that require resilient local infrastructure and meaningful location diversity.

Growing Demand Base
Location Diversity
Business Continuity
Regional Growth
Efficiency through infrastructure discipline.
Sustainability

Efficiency through infrastructure discipline.

JDC's sustainability approach begins with disciplined design: efficient cooling pathways, modular activation, lifecycle-conscious engineering and capacity fitted out against real demand.

Efficient Cooling
Modular Activation
Lifecycle Design
Demand-Fitted

Development underway. Built for long-term operation.

JDC is advancing its site, energy, design, partner and connectivity workstreams towards an opening in 2029. The programme is being structured for modular customer activation within a fully coordinated campus platform.

OPENING 2029 • PARTNERSHIP AND EARLY CAPACITY DISCUSSIONS ARE OPEN

Build with us.

We are engaging operating, technology, connectivity, commercial and strategic partners with the capability to help deliver and scale the platform. We are also opening early conversations with organisations evaluating future capacity in Southern Nigeria.

Office
27B Prince Adelowo Adedeji, Off Admiralty Way, Lekki Phase 1, Lagos, Nigeria